[水面舰艇] 首艘国产航母001A型航空母舰专题:2017年4月26日下水

[复制链接]
klonoa1121 发表于 2016-2-17 23:45 | 显示全部楼层
http://www.haohanfw.com/forum.ph ... page%3D1&page=1舰岛近况,感谢听海之猫好图



宝莲灯


本帖子中包含更多资源

您需要 登录 才可以下载或查看,没有帐号?注册会员

x
红色信号 发表于 2016-2-18 03:42 | 显示全部楼层
klonoa1121 发表于 2016-2-17 23:45
http://www.haohanfw.com/forum.php?mod=viewthread&tid=21024&extra=page%3D1&page=1舰岛近况,感谢听海之 ...

基本就是瓦良格的改进升级版
 楼主| zhh894217 发表于 2016-6-4 11:21 | 显示全部楼层

本帖子中包含更多资源

您需要 登录 才可以下载或查看,没有帐号?注册会员

x
langge945 发表于 2016-6-4 13:32 | 显示全部楼层

这样看,这航母还有成为弹射起飞航母的可能性,如果按照国外从这图判断的话。
langge945 发表于 2016-6-4 13:43 | 显示全部楼层
对比图。。

本帖子中包含更多资源

您需要 登录 才可以下载或查看,没有帐号?注册会员

x
红太郎 发表于 2016-6-11 09:42 | 显示全部楼层
期待国产二号舰赶紧开工!
lemoncap 发表于 2016-6-30 18:09 | 显示全部楼层
SEPTEMBER 23, 2015 — Sea trials for the first-in-class nuclear aircraft carrier Gerald R. Ford (CVN-78) are being delayed. In a statement issued yesterday, the Navy said it had "identified a slight deterioration in the required progress on the CVN 78 shipboard test program.
The Navy and shipbuilder, Newport News Shipbuilding had scheduled a delivery date of March 31, 2016 for the ship. That will now likely slip  to mid- or late-May.

In its statement yesterday, the Navy said "the sea trial schedule will be delayed about six to eight weeks. The exact impact on ship delivery will be determined based on the results of sea trials.The Navy called the delay a "prudent step" providing "the most affordable path to delivery. All the work and any associated schedule delays are being managed within budget and below the $12,887 million cost cap."

The Navy did not say what particular part of the test program has gotten behind schedule.
lemoncap 发表于 2016-6-30 18:16 | 显示全部楼层
本帖最后由 lemoncap 于 2016-6-30 18:19 编辑

Supercarrier Ford to join Navy fleet in September
Brad Lendon-Profile-Image
By Brad Lendon, CNN
Updated 1725 GMT (0125 HKT) April 8, 2016-------------------------------------------------------------------------
8 个月过去了,离开服役还是3个月
lemoncap 发表于 2016-6-30 18:22 | 显示全部楼层
Advanced Arresting Gear Tests Delayed But Little Operational Impact Expected

By: Megan Eckstein
May 17, 2016 8:03 AM
F/A-18E Super Hornet lands with the Advanced Arresting Gear at Joint Base McGuire-Dix-Lakehurst, in Lakehurst, New Jersey, on March 31, 2016. US Navy Photo
F/A-18E Super Hornet lands with the Advanced Arresting Gear at Joint Base McGuire-Dix-Lakehurst, in Lakehurst, New Jersey, on March 31, 2016. US Navy Photo

NATIONAL HARBOR, Md. – The Advanced Arresting Gear (AAG) test schedule for aircraft carrier Gerald R. Ford (CVN-78) was pushed back again, but the delay may cause little impact thanks to a slew of post-delivery test requirements for the first-in-class ship, the CVN-78 class program manager told USNI News.

Manned aircraft just began arrested landings on a ground-based AAG runway system in New Jersey on March 31, Capt. Chris Meyer said Monday at the Navy League’s Sea-Air-Space Exposition 2016, and the first manned airplanes will not be cleared to land on Ford until November. Program officials last fall said the manned aircraft landings in New Jersey were set to begin in February, with the first ship landings cleared by this summer.

Due to a design problem in General Atomics-built AAG discovered three years ago, the system faced about a two-year delay and, whereas the rest of Ford is 98 percent complete, AAG is still being installed on the ship. The Navy intended to install the improved AAG on the ship and conduct land-based tests at Joint Base McGuire-Dix-Lakehurst, N.J., concurrently to help buy back lost time. Though the delays with AAG continue, Meyer said it was possible that the new pushed-back schedule would have no operational impact.

On the hull side, Ford is set for builder’s trials and acceptance trials in August, where the ship’s propulsion, mechanical, electrical and combat systems will be tested but not flight deck operations. The carrier is set for a late-September delivery – compared to the previous March 2016 delivery date – pending the results of the sea trials, Meyer told USNI News after his presentation. Once the ship delivers to the Navy, six-month shakedown period will begin.

点评

你这三楼贴错了吧,跟我们国产航母没关系  发表于 2016-6-30 22:46
fly2014 发表于 2016-6-30 19:01 | 显示全部楼层
http://v.ifeng.com/mil/mainland/ ... 70e01.shtml#_v_www4
独家:弹射版歼15今日首飞成功 弹射航母板上钉钉
高高空 发表于 2016-7-1 12:08 | 显示全部楼层
这艘就是瓦良格小改,和弹射器没啥关系
lemoncap 发表于 2016-7-1 17:11 | 显示全部楼层
本帖最后由 lemoncap 于 2016-7-1 17:27 编辑
lemoncap 发表于 2016-6-30 18:22
Advanced Arresting Gear Tests Delayed But Little Operational Impact Expected

By: Megan Eckstein

回复klonoa1121:

回复本话题中CVN-78的电磁弹射-回收的风险的原帖。给国产航母一个参照。
闷雷 发表于 2016-7-2 01:58 | 显示全部楼层
弹射器还是等002吧, 多半还是蒸汽弹射器先来。
红太郎 发表于 2016-7-2 11:19 | 显示全部楼层
002肯定是蒸汽弹射器。
bluebluestar 发表于 2016-7-7 16:31 | 显示全部楼层
红太郎 发表于 2016-7-2 11:19
002肯定是蒸汽弹射器。

估计要等到003才能上电磁弹射器
bluebluestar 发表于 2016-7-10 08:56 | 显示全部楼层
【我国首艘国产航空母舰建造跟踪36】#001A#近日完成第8个舰艏分段,第6、第7个左舷分段,第7个右舷分段吊装。

回复 支持 1 反对 0

使用道具 举报

 楼主| zhh894217 发表于 2016-7-17 16:43 | 显示全部楼层


http://www.fyjs.cn/forum.php?mod ... &extra=page%3D1

本帖子中包含更多资源

您需要 登录 才可以下载或查看,没有帐号?注册会员

x
klonoa1121 发表于 2016-7-23 12:06 | 显示全部楼层

本帖子中包含更多资源

您需要 登录 才可以下载或查看,没有帐号?注册会员

x
hwshenhw96 发表于 2016-7-29 16:34 | 显示全部楼层
【我国首艘国产航空母舰建造跟踪39】#001A#近日完成第8个左舷分段吊装。


本帖子中包含更多资源

您需要 登录 才可以下载或查看,没有帐号?注册会员

x
 楼主| zhh894217 发表于 2016-8-4 23:56 | 显示全部楼层
终于,甲板贯通,祝贺一下


本帖子中包含更多资源

您需要 登录 才可以下载或查看,没有帐号?注册会员

x
您需要登录后才可以回帖 登录 | 注册会员

本版积分规则

QQ|申请友链|旗下论坛|小黑屋|手机版|航空航天港 ( 豫ICP备12024513号 )

GMT+8, 2017-5-29 06:13 , Processed in 0.337953 second(s), 18 queries , Gzip On.

Powered by Discuz! X3.2

© 2001-2013 Comsenz Inc.

快速回复 返回顶部 返回列表