 楼主| JSTCVW09CD 发表于 2012-2-1 00:56 | 显示全部楼层
本帖最后由 JSTCVW09CD 于 2012-2-26 16:43 编辑

==============

俄国家原子能公司2012年度大幅度提高科研经费
Rosatom channeled 3.7% of proceeds to finance R&D in 2011

31.01.2012

Rosatom channeled 3.7% proceeds to finance R&D in 2011 and this year plans to raise this up to 4.5%.
These numbers were voiced by Rosatom’s director general Sergey Kiriyenko at a session of the governmental commission on high technologies and innovations held on January 30.


 楼主| JSTCVW09CD 发表于 2012-2-1 23:33 | 显示全部楼层
lxf11711 发表于 2012-1-27 18:01
J大能不能把堆型罗列一下,想知道哪些是快堆,以及铅铋冷却还是钠冷却

===========

这也是一个铅冷堆型BREST-300。

2014年完成设计工作。2016年开工。

The work on a detailed design of the lead-cooled fast neutron reactor BREST-300 will be finished in 2014, said Vadim Lemekhov, chief designer of BREST at NIKIET, at the forum of nuclear industry suppliers ATOMEX 2011 opened in Moscow on December 6. Then, the working and project documentation should be produced before the end of 2015, including a regulatory review, and the construction of BREST-300 should start in 2016 with completion in 2020, according to Lemekhov

lxf11711 发表于 2012-2-2 06:51 | 显示全部楼层
JSTCVW09CD 发表于 2012-2-1 23:33
===========

这也是一个铅冷堆型BREST-300。

快中子反应堆是四代堆的趋势,以前看到过俄罗斯联邦规划是2020左右大规模并网发电
 楼主| JSTCVW09CD 发表于 2012-2-2 09:44 | 显示全部楼层
lxf11711 发表于 2012-2-2 06:51
快中子反应堆是四代堆的趋势,以前看到过俄罗斯联邦规划是2020左右大规模并网发电

还是以建造NPP-2006为主。
lxf11711 发表于 2012-2-7 16:09 | 显示全部楼层
俄罗斯废物贮存设施投入运行
[据俄罗斯Rosatom官方网站2012年1月31日报道] 俄罗斯近期将开始在位于西伯利亚Zheleznogorsk的新建集中化临时干法贮存设施(ISF)贮存RBMK-1000和VVER-1000反应堆的乏燃料。该设施一期工程已于近期完成,第一批RBMK燃料即将运到。

    集中化贮存设施一期工程位于Zheleznogorsk的采矿与化学联合企业(MCC)。设施的第一部分于2011年12月投入运行,将贮存8129吨来自三个RBMK核电厂的乏燃料。这些乏燃料目前贮存在核电厂的乏燃料水池内,即将达到饱和。第一批乏燃料将在3月底以前经铁路运到。每个燃料运输罐可装载8吨乏燃料。

    ISF长270米,宽35米,高40米,总计可贮存38000吨乏燃料。乏燃料将在该设施贮存达50年,等待后处理能力建成。俄罗斯未来还规划建立高放废物地质处置库
http://www.dsti.net/Information/News/73788
lxf11711 发表于 2012-2-7 16:10 | 显示全部楼层
俄罗斯推动核工业私有化
[据世界核新闻网站2012年2月2日报道]俄罗斯过去五年将核电、核工程与核研究企业合并到了俄罗斯原子集团公司(Rosatom)。作为工业现代化计划的一部分,俄罗斯政府下一步将推动该公司的私有化。

    俄罗斯总统普京在1月30日出版的《俄罗斯商业日报》发表长篇文章,列出了一系列在遏制腐败,并改善合法投资环境的同时,推动基础设施、创新和私营企业发展的政府目标。他写道,俄罗斯过去建立了多个像Rosatom这样的国有公司,来阻止国家工业高智力部门在后苏维埃时代的下滑。“我们不得不合并了过去由政府所有,但是管理脱节、丧失了与其各自研究领域和设计中心一切联系的各项资产。”政府工作的重点是“恢复俄罗斯在这些行业的竞争能力”。普京强调,国有资产的扩大只是因为这些领域还没有私有企业。普京指出,俄罗斯已经“编制了一项计划,为的是重新组织每一个(国有)公司,并随后使其进入市场”。

    Rosatom负责管理俄罗斯军事核计划的部门将继续完全由国家控制。其民用资产——例如核燃料,反应堆技术,核电厂运行、维护与废物管理——将转变成一个“公共责任公司”,并“随后将其股份出售”。

    Rosatom负责人基里延科向Regnum通讯社表示,俄罗斯民用核工业的发展已经考虑到了合作伙伴。他认为,普京提出的任务是“鼓励核工业继续在有前景的项目上发展伙伴关系,不但有国家投资,还要考虑不断增加私有投资份额”。

    2011年,Rosatom已经与英国罗尔斯·罗伊斯公司签署协议,考虑互惠性合作的可能性。Rosatom的子公司Atomenergomash还和阿尔斯通组成了生产核电厂蒸汽涡轮机的联合企业
http://www.dsti.net/Information/News/73791
 楼主| JSTCVW09CD 发表于 2012-2-13 21:21 | 显示全部楼层
http://en.rian.ru/business/20120213/171290222.html
--
Lukashenko Urges Russia to Expedite Nuke Plant Construction
-
Belarus has asked Russia's national development bank Vnesheconombank (VEB) to speed up construction of the country's first $9-billion nuclear power station, Belarusian President Alexander Lukashenko said on Monday.

"The core project (for us) is the nuclear plant construction as (VEB) will finance it. We have started to implement it and would not like to see a slowdown. We should build the station rapidly," Lukashenko told VEB head Vladimir Dmitriyev.

At the same time when Europe is beginning to abandon nuclear power use, the nuclear power plant project in Belarus is important for both Russia and Belarus, Lukashenko said.

"Russian technologies ... and our opportunities will show that the century of nuclear power is not over, it will continue," Lukashenko added.

Nuclear power has once again become a controversial issue after an earthquake and tsunamidamaged the Fukushima station in Japan in March 2011. Germany said it would hasten its exit from nuclear energy and Italy announced a one-year moratorium on plans to restart atomic power projects.

Many people died of radiation-related diseases in Belarus following the 1986 Chernobyl atomic station disaster in neighboring Ukraine, in the world's worst nuclear disaster.

Russia now says it has a full arsenal of advanced technology to ensure accident-free operations at power stations it builds.

 楼主| JSTCVW09CD 发表于 2012-2-14 11:29 | 显示全部楼层
越南的对于核电站的抗震要求不低
-
Vietnam’s first N-plant to withstand an intensity 9 earthquake

13.02.2012

The first nuclear power plant to be built in Vietnam will withstand an intensity 9 earthquake, a Rosatom’s top-ranking official told journalists in Hanoi on February 10. According to Sergey Boyarkin, deputy director general of Rosatom, the plant to be built in the central province of Ninh Thuan in 2014, will also be far enough from sea to be safe from tsunamis, VnExpress reported

wanghuanbs 发表于 2012-2-16 02:46 | 显示全部楼层
王海涛 发表于 2011-11-16 00:20
这里不是英文论坛,你如果永远都是用谷歌机器把国外论坛的文章翻成英文,就随便往这儿乱转,奉劝你回到你的 ...

英文是国际语言,有什么问题?
 楼主| JSTCVW09CD 发表于 2012-2-20 08:42 | 显示全部楼层
本帖最后由 JSTCVW09CD 于 2012-2-20 08:45 编辑

使劲造快堆


接下来应该是造BN-1200为主。其中的一个已经决定了。

-

Three more fast reactors may be built on Beloyarsk site

17.02.2012


Three more power units with fast neutron reactors may be built on the site of Beloyarsk nuclear power plant, Rosatom director general Sergey Kiriyenko told journalists in Yekaterinburg on February 17. A decision to build one more large power sodium-cooled fast neutron reactor BN at Beloyarsk has already been agreed, according to Kiriyenko....
 楼主| JSTCVW09CD 发表于 2012-2-26 16:41 | 显示全部楼层
本帖最后由 JSTCVW09CD 于 2012-2-26 16:42 编辑

Russian uranium fuel to Swedish NPP

2012-02-23

Russia’s nuclear fuel company TVEL announces a signed contract with Vattenfall Nuclear fuel AB for supply of lead fuel assemblies to be used in the third reactor at Sweden’s Ringhals nuclear power plant.  The contract is the first ever between Russia and a western designed pressure water reactor.The third reactor at Ringhals is the first of western design to be fueled with assemblies from Russia.

The fuel assemblies will be produced at TVEL’s uranium fuel plant in Novosibirsk, the company reports on its portal. In the first phase, four to eight experimental fuel assembiles will be delivered to the Swedish nuclear power plant located on the west coast near Gothenburg.

Rosatom, Russia’s state nuclear energy corporation says in a statement that a successful implementation of this project will let TVEL manufacturer access a new, vaster market of western design reactors and by that expand Russia’s position in the global nuclear fuel market.


g6-52l 发表于 2012-3-3 20:38 | 显示全部楼层
JSTCVW09CD 发表于 2012-2-20 08:42
使劲造快堆

又来画大饼,从2001年开始,提到别洛雅尔斯克电站的BN-800,毛子就讲还有两三年就要服役了,多少个”两三年“过去了,那里还是一片工地,还吹什么BN-1200。

点评

英文识别有一些障碍的。 所以...被不断的延期.....  发表于 2012-3-3 20:57
g6-52l 发表于 2012-3-4 01:16 | 显示全部楼层
JSTCVW09CD 发表于 2012-2-26 16:41
Russian uranium fuel to Swedish NPP

2012-02-23

当然不如阁下,阁下乃鼎鼎大名的明希豪森男爵之后,正宗的日耳曼贵族,出使过沙俄与土耳其,那外语简直是呱呱叫的呀。

点评

淡定啊, 这么快就开始做前滚翻了? 出乎意料了。 化学自动化设计局的那个坑里面的水还没喝完,就又开始了。  发表于 2012-3-4 01:49
 楼主| JSTCVW09CD 发表于 2012-3-4 01:59 | 显示全部楼层
本帖最后由 JSTCVW09CD 于 2012-3-4 02:31 编辑
g6-52l 发表于 2012-3-4 01:16
当然不如阁下,阁下乃鼎鼎大名的明希豪森男爵之后,正宗的日耳曼贵族,出使过沙俄与土耳其,那外语简直是 ...

--

喔,又开始前滚翻和后滚翻的经典动作了。


进入看戏模式,等着乃继续上场。

-
(说英语不行乱翻译,还不服......)
-
-
-



本帖子中包含更多资源

您需要 登录 才可以下载或查看,没有帐号?注册会员

x
 楼主| JSTCVW09CD 发表于 2012-3-12 22:32 | 显示全部楼层
俄罗斯参与约旦第一座核电站竞标

2012-03-09

[据世界核新闻网站2012年3月7日报道] 俄罗斯向约旦递交了一份建造4座核电反应堆的竞标书。该竞标书与之前其提供给土耳其的一样,也是为建造该国的第一座反应堆独立竞标,本月底将宣布中标方案。

    据俄罗斯联邦原子能机构引用的约旦时代报报告,俄罗斯联邦原子能机构的反应堆出口子公司“原子能出口公司(ASE)”在1月接洽了约旦原子能委员会,提议建造4座1200 MWe的VVER机组,这与之前其和土耳其达成的协议十分类似。如果4座机组全部建成,将向电网提供4000 MWe的发电量,使约旦现有的发电量翻了一番多。

    2010年5月,俄罗斯与土耳其签署了一份关于建造土耳其第一座核电站的国际协议,该核电站将由俄方项目公司所有并运营。这份价值约200亿美元的合同包括了在土耳其地中海沿岸的阿卡亚场址建造4座1200 MWe的VVER机组。为此,俄罗斯国有核能公司俄罗斯联邦原子能机构成立了一个项目子公司,子公司在项目初期由俄方全资所有。但从长远来看,俄罗斯可能会向来自土耳其或其他地方的投资者出售高达49%的股份,自身保留51%的控股权。
 楼主| JSTCVW09CD 发表于 2012-3-16 16:15 | 显示全部楼层
本帖最后由 JSTCVW09CD 于 2012-3-16 16:17 编辑
JSTCVW09CD 发表于 2012-2-1 23:33
===========

这也是一个铅冷堆型BREST-300。

这一个堆型估计在2012年年底能拿到开工许可证,也有可能在2013年初, 看样子明年能开工建造。

这是铅铋冷却的。

-

本帖子中包含更多资源

您需要 登录 才可以下载或查看,没有帐号?注册会员

x

点评

哦~~,看来是冷却技术的不同吧  发表于 2012-3-16 16:32
600MW的BN-600都运行了30来年了。 在建的BN-800是800MW的,明年就临界了。  发表于 2012-3-16 16:30
俄罗斯的第一个商用快堆吗?100MW对于快堆很大了,看J大下面的帖子,100MW的2017投入发电,300MW的2020投入吧  发表于 2012-3-16 16:23
 楼主| JSTCVW09CD 发表于 2012-3-16 16:19 | 显示全部楼层
JSTCVW09CD 发表于 2012-2-1 23:33
===========

这也是一个铅冷堆型BREST-300。
这也是一个铅冷堆型BREST-300。

2014年完成设计工作。2016年开工。


BREST-300, 铅冷堆型
-

本帖子中包含更多资源

您需要 登录 才可以下载或查看,没有帐号?注册会员

x
 楼主| JSTCVW09CD 发表于 2012-3-16 16:33 | 显示全部楼层
----

本帖子中包含更多资源

您需要 登录 才可以下载或查看,没有帐号?注册会员

x
 楼主| JSTCVW09CD 发表于 2012-3-16 16:34 | 显示全部楼层
-------

本帖子中包含更多资源

您需要 登录 才可以下载或查看,没有帐号?注册会员

x
 楼主| JSTCVW09CD 发表于 2012-3-16 16:36 | 显示全部楼层
北极开发紧密相关
-

本帖子中包含更多资源

您需要 登录 才可以下载或查看,没有帐号?注册会员

x
您需要登录后才可以回帖 登录 | 注册会员

本版积分规则

QQ|申请友链|旗下论坛|小黑屋|手机版|航空航天港 ( 豫ICP备12024513号 )

GMT+8, 2018-7-17 05:46 , Processed in 1.388652 second(s), 23 queries , Gzip On.

Powered by Discuz! X3.2

© 2001-2013 Comsenz Inc.

快速回复 返回顶部 返回列表