航空航天港

 找回密码
 注册会员

QQ登录

只需一步,快速开始

楼主: 蘑菇炖豆腐
收起左侧

[专题专项] 俄巡洋舰改造,大型舰艇和潜艇专题

[复制链接]
StarDreadnought 发表于 2011-11-19 13:15 | 显示全部楼层
SSC-X-4可不只是陆上,陆海空齐全,不过体积和重量那个就很壮观了
预定Tu160带两发,Y级改造潜艇带12发,你真的准备在855上装这个?这么少的导弹除了丢核弹还能干什么?另外这年头走高空的东西有生存力么?
何况这东西还从未达到过预定射程,试射十几次之后取消了从未列装。
shaolin1254 发表于 2011-11-19 14:32 | 显示全部楼层
不能说走高空的东西肯定没生存力。还是要看你这东西的技术性能。亚音速、低机动性,那你走高空除了被拦截就是失效。
像美国现在陆、空两军研究的高超音速武器AHW、HTV-2都是用3级战略导弹做助推,高空滑翔打击目标。虽然试验有成有败,但美军的发展方向很明确。这对于拦截方来说,探测、拦截的要求更高。
JSTCVW09CD 发表于 2011-11-19 15:06 | 显示全部楼层
本帖最后由 JSTCVW09CD 于 2011-11-19 15:08 编辑
StarDreadnought 发表于 2011-11-19 13:15
SSC-X-4可不只是陆上,陆海空齐全,不过体积和重量那个就很壮观了
预定Tu160带两发,Y级改造潜艇带12发,你 ...

乃说是服役了,还是没服役呢?

USSR签署的服役命令


8米多一点的长度, 650mm的弹直径算大么?



Engineering samples of the complex machine  were collected at the NPP "Start" and in 1984 were self-contained tested. Tests were conducted at the landfill complex 929 glycyl  by Air Defense of the USSR during 1983-1986 in Akhtubinsk - Produced four models of rockets and launched 6 starts.


Its acceptance into service was given by a decree of the USSR CM № 108-32 on October 4, 1984. state tests were carried out in 1985-1986 . Complex and missiles entered service in 1986 and  the design documentation was transfered to Kalinin Machine Building Plant in Sverdlovsk for serial production 。However,  only the first initial batch of complexes RC-55 "Relief," was released which was destroyed by the INF Treaty .I n the 1989 , destruction of the complex was carried out under the supervision of experts from the U.S. Air Force Base, Jelgava.

==


这个尺寸算大?


-

本帖子中包含更多资源

您需要 登录 才可以下载或查看,没有帐号?注册会员

x
StarDreadnought 发表于 2011-11-19 16:57 | 显示全部楼层
本帖最后由 StarDreadnought 于 2011-11-19 17:07 编辑

抱歉,刚才回的时候没看到图以为是AS-19/SS-N-24这个怪物(SSC-X-5)。对SSC-编号不熟。
SS-N-21无论如何算是正常尺寸的和服役的
但是3000公里那也是只能用很轻的核弹头(100公斤量级)达到的射程,换上高爆炸药就没啥实际意义了
然后再减弹头不可能(物理极限),再加油箱会放不进弹仓,从俄国人给他加保型油箱来看,加油箱这条路也算到尽头了

此外非空射型战斧斯基的图比较少见,多谢了
不知道为什么空射型要用发动机吊舱这种设计

点评

这个移动发射的家伙。 一直被老美盯着。 服役不久就被当做重点对象削减了( 根据削减武器条约)  发表于 2011-11-19 19:55
StarDreadnought 发表于 2011-11-19 17:01 | 显示全部楼层
话说回来还是SS-N-24这东西够暴力美学,不过不知道怎么实现超音速+3000公里等级的射程的
我觉得使用压缩升力提高升阻比也许是条可行的道路?
JSTCVW09CD 发表于 2011-11-27 12:03 | 显示全部楼层
==========

海军上将造船厂早一段时间为黑海舰队开铺的第二艘636.3升级型潜艇图。

--

本帖子中包含更多资源

您需要 登录 才可以下载或查看,没有帐号?注册会员

x
JSTCVW09CD 发表于 2011-12-2 15:31 | 显示全部楼层
http://www.rusnews.cn/eguoxinwen ... 11202/43236336.html

==
俄罗斯已开建“北风之神-A”战略核潜艇第一艘

-
俄新网RUSNEWS.CN莫斯科12月2日电 北方造船厂(Sevmash)和“鲁宾”海洋工程中央设计局总经理安德烈·季亚奇科夫在接受俄新社采访时表示,改进的955项目“北风之神-A”第一艘战略核潜艇的建造实际上已经开始。

截止到目前为止,北方造船厂有3艘鲁宾海洋工程中央设计局研制的“北方之神”(955项目)型舰艇:“尤里·多尔戈鲁基”、“亚历山大·涅夫斯基”和“弗拉基米尔·莫诺马赫”,它们的建造程度不同。“北方之神”和“北方之神-A”项目一共应该建造8艘战略核潜艇。

季亚奇科夫说:“‘北风之神'第四艘、‘北风之神-A'第一艘的建造实际上已经开始。”

点评

就是“圣·尼古拉”号,已经开工建造。  发表于 2011-12-2 20:16
JSTCVW09CD 发表于 2011-12-2 19:26 | 显示全部楼层
本帖最后由 JSTCVW09CD 于 2011-12-2 19:28 编辑

http://lenta.ru/news/2011/12/02/severodvinsk/
==

第一艘885要到2012年才能交付。



导弹系统试验和完善还需要时间


居然P-800和3М-54Э / 3М-54Э1的国家验收试验没完成。 也是等弹。

JSTCVW09CD 发表于 2011-12-2 19:36 | 显示全部楼层
http://lenta.ru/news/2011/12/02/shark/

==

布拉瓦试验完成后。  该艘台风级将改成试验艇。 声纳,武器系统等试验用途。

点评

一点都不奢侈,船大就是好,什么都装得下  发表于 2011-12-3 15:53
不止一艘台风级。 还有一艘在船台的奥斯卡改进型也将直接改成综合试验艇了。  发表于 2011-12-3 01:46
总用台风做试验艇太奢侈了  发表于 2011-12-2 23:23
JSTCVW09CD 发表于 2011-12-2 19:57 | 显示全部楼层
本帖最后由 JSTCVW09CD 于 2011-12-2 20:02 编辑

http://ria.ru/interview/20111202/503747393.html

==

Sevmash船厂CEO专访。

--

首先将升级两艘,纳西莫夫和乌萨科夫号。 导弹换成P-800和3М-54Э / 3М-54Э1。

明年之后开始大改。

--

裤子航母大改,没有确认消息。

-------

阿库拉改进方案已经有了,将在星星修理厂进行。

=

明年用阿穆尔-1650竞标印度项目。

--
拉达改进正在进行。


另外采购636.3, 还是因为便宜,建造快。

==

JSTCVW09CD 发表于 2011-12-3 01:50 | 显示全部楼层
本帖最后由 JSTCVW09CD 于 2011-12-3 11:20 编辑

http://rusnews.cn/eguoxinwen/elu ... 11202/43237652.html

==
波罗的海工厂将以25亿卢布建造两艘西北风级航母船身

-
俄新网RUSNEWS.CN圣彼得堡12月2日电 俄新社记者报道,俄联合造船集团与波罗的海工厂2日签署协议,前者将利用后者的生产能力建造两艘"西北风"级直升机航母的船身,合同价格为25亿卢布。

联合造船集团总裁罗曼·特罗岑科与波罗的海工厂代理总经理瓦列里·文科夫分别代表双方签字。俄总理弗拉基米尔·普京出席了签字仪式。

===========================

http://en.rian.ru/world/20111202/169255665.html

========
Russia’s United Shipbuilding Corporation and the Baltiisky Zavod shipyard signed a 2.5 billion ruble ($80 million) contract on Friday to build hulls for the third and fourth French Mistral-class warships for the Russian Navy.The signing ceremony took place in the presence of Prime Minister Vladimir Putin.
Russian defense officials previously said Russia would account for 80% of labor inputs in building the third and fourth warships.
JSTCVW09CD 发表于 2011-12-3 10:58 | 显示全部楼层
http://en.rian.ru/mlitary_news/20111203/169272925.html

==

看来内部拆设备得需要明年拆一年时间了。


目前得到消息是核堆的燃料已经全部拆除。 11月的图可以看出部分雷达天线已经拆除。

============

Russia to refit Admiral Nakhimov nuclear cruiser after 2012

--
The overhaul of mothballed Admiral Nakhimov nuclear-powered cruiser will start after 2012 with the focus on refitting the ship with advanced weaponry and electronics, the Sevmash shipyard said.
The Admiral Nakhimov (former Kalinin) Kirov class cruiser was commissioned in 1988 and mothballed in 1999. It has been docked at the Sevmash shipyard in the city of Severodvinsk in northern Russia, undergoing repairs since 2005.

“During the talks with the Russian Defense Ministry, we have concluded that it would be senseless to continue the repairs without determining the final variant of the modernization, so the repair work has been suspended [until after 2012],” Sevmash General Director Andrei Dyachkov said on Friday in an exclusive interview with RIA Novosti.

Dyachkov said that the main changes during the overhaul will be applied to cruiser’s armaments as the SS-N-19 Shipwreck missiles – the ship’s current main weaponry – have become outdated.
The SS-N-19s will be replaced with P-800 Yakhont (SS-N-26) anti-ship cruise missiles. The cruiser will also receive advanced air defense missile systems based on the land-based S-400 Triumf, and new point-defense systems.

Russia built four Kirov class nuclear-powered cruisers in 1974-1998. One of them, the Pyotr Veliky, is still in active service as the flagship of the Northern Fleet.

Several sources in the Russian military and defense industry earlier said that the Russian Defense Ministry was planning to refit the Admiral Nakhimov, Admiral Lazarev and Admiral Ushakov missile cruisers by 2020 in a major boost for the Russian Navy's combat strength.

Dyachkov said on Friday the fate of the Admiral Ushakov, which has been docked at the Zvezdochka shipyard in Severodvinsk, has not been determined.

The Kirov class main weapons in current configuration include 20 SS-N-19 Shipwreck missiles, designed to engage large surface targets, and air defense is provided by 12 SA-N-6 Grumble launchers with 96 missiles and two SA-N-4 Gecko with 40 missiles.
After the refit, the Kirov class cruisers will most likely be deployed with Russia's Northern and Pacific fleets as part of large task forces set up to carry out a variety of combat missions - from "hunting" the adversary's aircraft carriers and submarines to massive land assaults.

============

P-800, 3M54系列, S-400上舰版, 新的点防御系统。

点评

关键是S-400的雷达是整合在集成雷达桅杆中,还是像以前那样直接把陆地用的雷达安装在舰艇上?  发表于 2011-12-3 15:59
Sevmash船厂的报道是去年拆完的。  发表于 2011-12-3 13:55
停航这么多年,一直都没拆核燃料?  发表于 2011-12-3 13:11
JSTCVW09CD 发表于 2011-12-3 11:02 | 显示全部楼层
JSTCVW09CD 发表于 2011-12-2 15:31
http://www.rusnews.cn/eguoxinwen/eluosi_anquan/20111202/43236336.html

==

http://en.rian.ru/mlitary_news/20111203/169263294.html

==========

这个消息明显忽略了已经开工的“
圣-尼古拉” 号作为第一艘955A型潜艇了。

=======
955A与955的差别主要是955A将进行重大结构更改, 同时增加4个发射筒。

2012年第一季度增加2艘955A的合同。

------
Dyachkov said the contracts on the construction of two more Borey-A class submarines would be signed in the Q1 of 2012.


The official did not specify the differences between the Borey and Borey-A class submarines, but it was reported earlier by some Russian military sources that modifications could include major structural changes and the installation of four more missile launch tubes.

JSTCVW09CD 发表于 2011-12-12 15:39 | 显示全部楼层
=======================
http://lenta.ru/news/2011/12/12/antey/

========================

升级改进奥斯卡级巡航导弹潜艇时进行换装。


改进武器系统方案制定设计局: 鲁宾设计局


地点: 东方的星星修船厂和 欧洲部分的星星修船厂( 东西方的两个专业潜艇维修和改进的专业户)


被换装对象: 花岗岩巡航导弹



新弹: "Оникс" 和 "Калибр"  也就是分别对应 P-800( 3M55, SS-N-26) 和 3М-54Э/3М-54Э1( SS-N-27)


第一艘武器换装服役时间: 换装艇进入欧洲部分的星星造船厂进行改进换装, 2012年换装改进完成后进入服役。







=============================================================
JSTCVW09CD 发表于 2011-12-16 23:09 | 显示全部楼层
http://en.rian.ru/world/20111216/170306340.html

==
Russia to lease  Nerpa nuclear submarine to India by yearend

--
Russia will lease its Nerpa nuclear submarine to India by the end of the year, the head of Russia’s federal agency in charge of military and technical cooperation, Mikhail Dmitriyev, said on Friday.
“We have planned to do it by the end of the year,” Dmitriyev told journalists in Moscow.
The delivery will make India the sixth country to operate nuclear-powered submarines, after France, China, Russia, Britain and the United States.
The $650 million lease contract for the Nerpa was signed in 2004. The transfer was initially scheduled for 2008, but was put on hold following a fatal accident later that year, in which 20 people, mostly civilians, died and two dozen others were poisoned on board the submarine when a freon gas fire suppressant system was accidentally set off.
Friday’s announcement on the submarine lease came during a visit by Indian Prime Minister Manmohan Singh to Russia. Russian President Dmitry Medvedev met with Singh earlier in the day.
The November 2008 accident on board the submarine, which occurred during a trial in the Sea of Japan, was Russia’s worst naval tragedy since the sinking of the Kursk nuclear submarine in 2000.
The Nerpa’s captain, Dmitry Lavrentyev, and engineer Dmitry Grobov, who allegedly activated the sub’s fire safety system “without authorization and for no reason,” were charged with negligence, but later acquitted.
During Singh’s visit to Moscow, the two countries also signed an agreement on the supply of kits to assemble 42 Su-30MKI Flanker multirole fighters for the Indian Air Force.
India has been the largest purchaser of Russia’s military equipment since 2007.
JSTCVW09CD 发表于 2011-12-22 19:31 | 显示全部楼层
http://russianforces.org/blog/20 ... ct_667bdrm_su.shtml

========
Verkhoturie Project 667BDRM submarine will return to service in 2012

--

The K-51 Verkhoturie submarine of the Project 667BDRM/Delta IV class, which began overhaul in August 2010, will not return to active service until the end of 2012.
JSTCVW09CD 发表于 2011-12-24 00:32 | 显示全部楼层
Zvezdochka shipyard started Smolensk N-sub overhaul

23.12.2011
                                                       
The ship repair center Zvezdochka in Severodvinsk has started restoring technical capabilities of the nuclear submarine missile cruiser K-410 Smolensk (Project 949A Antey; NATO class - Oscar), the shipyard said on December 22. Zvezdochka received the submarine in September 2011. In November the ship was taken out from water and placed in the dock
JSTCVW09CD 发表于 2012-1-8 14:30 | 显示全部楼层
===============

蓝天潜射洲际导弹装填全过程--配图


====================








本帖子中包含更多资源

您需要 登录 才可以下载或查看,没有帐号?注册会员

x
JSTCVW09CD 发表于 2012-1-8 14:31 | 显示全部楼层
=======================================

蓝天潜射洲际导弹装填全过程--配图


====================






本帖子中包含更多资源

您需要 登录 才可以下载或查看,没有帐号?注册会员

x
JSTCVW09CD 发表于 2012-1-8 14:33 | 显示全部楼层
===============

蓝天潜射洲际导弹装填全过程--配图


====================



本帖子中包含更多资源

您需要 登录 才可以下载或查看,没有帐号?注册会员

x
您需要登录后才可以回帖 登录 | 注册会员

本版积分规则

QQ|申请友链|旗下论坛|小黑屋|手机版|航空航天港 ( 豫ICP备12024513号 )

GMT+8, 2017-7-27 22:50 , Processed in 1.285283 second(s), 18 queries , Gzip On.

Powered by Discuz! X3.2

© 2001-2013 Comsenz Inc.

快速回复 返回顶部 返回列表